• Welcome !!!!
This website for sale. For an enquiry please contact @ atareaview@gmail.com
 
GOOD
54 user votes
40
  • Puducherry, is a union territory of India. It has four administrative divisions: four districts, viz. Pondicherry, Mahe, Yanam and Karaikal. Pondicherry is the largest district both in terms of area and population. Mahe is smallest region in terms of area and population. All the four previous colonies in French India were organised as Union Territory of Puducherry after merging into India .
    Read More
  • PONDICHERRY's District wise
Average pumping hours
State District Location of Schemes - On the Maj/Med Location of schemes - Outside command Avg pumping hours (0-4) Avg pumping hours (4-8) Avg pumping hours (8-12) Avg pumping hours (12-16) Avg pumping hours (16-20) Avg pumping hours (20-24) Total
PONDICHERRY KARAIKAL 0 6 0 6 0 0 0 0 6
Details of Projects Sanctioned Under NBA
State Name District Name Date of Sanction Project Cost Approved Centre Share Approved State Share Approved Beneficiary Share IHHL BPL Sanctioned IHHL APL Sanctioned IHHL TOTAL Sanctioned SCW Sanctioned School Toilets Sanctioned Anganwadi Toilets Sanctioned RSM/PC Sanctioned
PUDUCHERRY PONDICHERRY 18-09-2001 572.5599999999999 481.72 0 90.84 18000 0 18000 0 26 16 3
Details of Projects Sanctioned Upto 31st March2013
State Name District Name Date of Sanction Project Cost Approved Centre Share Approved State Share Approved Beneficiary Share IHHL BPL Sanctioned IHHL APL Sanctioned IHHL TOTAL Sanctioned SCW Sanctioned School Toilets Sanctioned Anganwadi Toilets Sanctioned RSM/PC Sanctioned
PUDUCHERRY PONDICHERRY 18-09-2001 572.56 481.72 0 90.84 18000 0 18000 0 26 16 3
District-wise Release of Funds From Centre Share
State Name District Name Financial Year Release from Center Share
PUDUCHERRY PONDICHERRY 1999-2000 0
Mineral and State wise Resources Reserves
Mineral Unit All India/State Reserves Remaining Resources Total Resources
China Clay 000 Tonnes Pondicherry 0 2940 2940
Number Of Towns And Villages Electrified In India
State/Union Territory Towns Total(1) Towns Electrified(1) Towns Percentage Villages Total(1) Villages Electrified(2) Villages Percentage
Pondicherry 6 6 100 92 92 100
Protected Area Network Across The Country (2011-12)
S.No State/UT No. of National Parks No. of
35 Pondicherry 0 1 0 0
Requirement And Availability Of Major Fertilizers
Year Month Product State Requirement(in 000'MTS) Availability(in 000'MTS)
2012-13 April DAP Pondicherry 700.00 0.00
State-Wise Details of Cumulative Grid Interactive Renewable Power Installed Capacity
STATES / UT Small Hydro Power - 31.03.2010 - (MW) Small Hydro Power - 31.03.2011 - (MW) Wind Power - 31.03.2010 - (MW) Wind Power - 31.03.2011 - (MW) Bio-Power - Biomass Power - 31.03.2010 - (MW) Bio-Power - Biomass Power - 31.03.2011 - (MW) Bio-Power - Waste to Energy - 31.03.2010 - (MW) Bio-Power - Waste to Energy - 31.03.2011 - (MW) Solar Power - 31.03.2010 - (MWp) Solar Power - 31.03.2011 - (MWp) Total Capacity 31.03.2010 Total Capacity 31.03.2011
Pondicherry NA NA NA NA NA NA NA NA 0.03 0.79 0.03 0.79
State-wise IEMs filed by Industrial Undertakings
State/UT IEMs Filed during August 1991 to December 2006 (in Nos) Proposed Investment during August 1991 to December 2006 (in Rs.Cr) IEMs Filed during January 2007 to December 2007 (in Nos) Proposed Investment during January 2007 to December 2007 (in Rs.Cr) IEMs Filed during January 2008 to December 2008 (in Nos) Proposed Investment during January 2008 to December 2008 (in Rs.Cr) IEMs Filed during January 2009 to December 2009 (in Nos) Proposed Investment during January 2009 to December 2009 (in Rs.Cr) IEMs Filed during January 2010 to December 2010 (in Nos) Proposed Investment during January 2010 to December 2010 (in Rs.Cr) IEMs Filed during January 2011 to December 2011 (in Nos) Proposed Investment during January 2011 to December 2011 (in Rs.Cr) IEMs Filed during January 2012 to December 2012 (in Nos) Proposed Investment during January 2012 to December 2012 (in Rs.Cr) IEMs Filed during January 2013 to December 2013 (in Nos) Proposed Investment during January 2013 to December 2013 (in Rs.Cr) IEMs Filed during January -February 2014 (in Nos) Proposed Investment during January -February 2014 (in Rs.Cr)
Pondicherry 679 8262 16 899 24 1020 14 712 14 282 8 44 8 146 5 186 0 0
State-wise Industrial Investment Proposals Received From Industrial Undertakings
NAME OF THE STATE IEMs Filed LOIs/DILs issued during August 1991 to December 2006 (in Nos) %age of Total Proposals during August 1991 to December 2006 Proposed Investment during Augsut 1991 to December 2006 (in Rs.Cr) %age of Total Proposed Investment during August 1991 to December 2006 IEMs Filed LOIs/DILs issued during January 2007 to December 2007 (in Nos) %age of Total Proposals during January 2007 to December 2007 Proposed Investment during January 2007 to December 2007
Pondicherry 698 0.96 9566 0.38 16 0.42 899 0.11 24 0.59 1020 0.07 14 0.40 712 0.07 14 0.32 282 0.02 8 0.21 44 0.00 8 0.28 146 0.03 6 0.25 201 0.04 0 0.00 0 0.00
State-wise Installed Capacity of Grid Interactive Renewable Power
States / UTs Small Hydro Power (MW) Wind Power (MW) Bio-Power-BM Power/Cogen.(MW) Bio-Power-Waste to Energy (MW) Solar Power (MWp) Total Capacity (MW)
Pondicherry NA NA NA NA 0.03 0.03
State-wise Number of Institutes Interacting with DBT on Research and Development Projects
State Name Financial Year[2010-11] Financial Year[2011-12]
Pondicherry 10 11
State-wise Number of Projects Not Found Suitable for Funding
Number of Project Not Found Suitable Statewise Financial Year[2010-11] Financial Year[2011-12]
Pondicherry 4 5
State-wise Number of Projects Received
No of Project Received Statewise Financial Year[2009-10] Financial Year[2010-11] Financial Year[2011-12]
Pondicherry 2 5 7
State-wise Number of Research And Development Proposals Not Found Suitable
Name of States 2011-2012 2012-2013
Pondicherry 4 5
State-wise Ongoing Projects
Statewise Number of Ongoing Project Ongoing Project As on Date 6/03/2013
Pondicherry 9
State-wise Ongoing Research And Development Projects
Name of States Ongoing Projects
Pondicherry 12
State-wise Per Capita Sales of Petroleum Products
State/UT 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12*
Pondicherry 327.0 377.0 382.2 422.4 407.0 389.1 431.7 419.2 440.5
State-wise Plan Outlays and Expenditure
State/UT Tenth Plan 2002–03 Outlay 2002–03 Expenditure 2003–04 Outlay 2003–04 Expenditure 2004–05 Outlay 2004–05 Expenditure 2005–06 Outlay 2005–06 Expenditure 2006–07 Outlay 2006–07 Revised Estimates
Pondicherry 1636000 327209 300021 320500 325904 416000 419659 563500 566574 948500 1268140
State-wise Potential of Various Renewable Energy Technologies
Sl. No. States/ UTs Wind Power (MW) Small Hydro Power (MW) Bio-Energy - Biomass Power (MW) Bio-Energy - Bagase Cogeneration (MW) Bio-Energy - Waste To Energy (MW) Total
35 Pondicherry 120 NA NA NA 2 122
State-wise outlay and expenditure for Power Sector
Category State Twelfth Plan-Power sector Twelfth Plan-All sector 2012-13-Power sector 2012-13-All sector 2013-14-Power sector 2013-14-All sector
II. UTs Pondicherry 1015 20559 97.0 3000 80 2000.0
State or System wise Number of Hospitals and Dispensaries under Modern System and Indian System of Medicine and Homeopathy during Tenth Plan
State/UTs Sub centres Reqd. 1991 Sub centres In Position Sub centres Goal for the 10th Plan Primary Health Centres Reqd. 1991 Primary Health Centres In Position Primary Health Centres Goal for the 10th Plan Community Health Centre Reqd. 1991 Community Health Centre In Position Community Health Centre Goal for the 10th Plan Modern System of Medicine Dispensaries@ Modern System of Medicine Beds@ ISM&H Dispensaries@@ Modern System of Medicine Hospitals@ ISM&H Hospitals@@ ISM&H Beds Urban Family Welfare Centres UFWC Urban Family Welfare Centres Health Posts PostPartum Centres District level PostPartum Centres Sub-district Level
PONDICHERRY 58 80 22 10 39 29 3 4 1 12 3136 21 29 0 0 NULL NULL 3 NULL
State wise average length of water conveyance channel of surface lift schemes
State Total No of schemes Average length - Pucca channel Average length - Kutcha channel Average length - Underground channel Total
PONDICHERRY 406 157 7 0 164
State wise construction of deep tubewells over the years
State Upto 1986-87 During 1987-88 During 1988-89 During 1989-90 During 1990-91 During 1991-92 During 1992-93 During 1993-94 Total
PONDICHERRY 170 16 29 47 49 39 31 37 418
State wise construction of dugwells over the years
State Upto 1986-87 During 1987-88 During 1988-89 During 1989-90 During 1990-91 During 1991-92 During 1992-93 During 1993-94 Total
PONDICHERRY 153 16 16 8 17 4 2 6 222
State wise construction of shallow tubewells over the years
State Upto 1993-94 During 1994-95 During 1995-96 During 1996-97 During 1997-98 During 1998-99 During 1999-00 During 2000-01 Total (1994-01)
PONDICHERRY 3381 359 286 86 71 45 69 73 4370
State wise construction of surface lift schemes over the years
State Upto 1993-94 During 1994-95 During 1995-96 During 1996-97 During 1997-98 During 1998-99 During 1999-00 During 2000-01 Total (1994-01)
PONDICHERRY 7 0 0 0 0 0 0 0 7
State wise culturable command area and potential created through deep tubewells
State Culturable Command Area Irrigation potential created - Kharif Irrigation potential created - Rabi Irrigation potential created - Perennial Irrigation potential created - Others Total - Irrigation potential created
PONDICHERRY 1246 662 620 88 256 1626
State wise culturable command area and potential created through dugwells
State Culturable Command Area Irrigation Potential Created - Kharif Irrigation Potential Created - Rabi Irrigation Potential Created - Perennial Irrigation Potential Created - Others Total
PONDICHERRY 241 148 195 68 17 428
State wise culturable command area and potential created through shallow tubewells
State Culturable Command Area Irrigation potential created - Kharif Irrigation potential created - Rabi Irrigation potential created - Perennial Irrigation potential created - Others Total - Irrigation potential created
PONDICHERRY 6700 4544 3442 1256 788 10030
State wise deep tubewells according to water distribution system
State Sprinkler Drip Irrigation Open channel Under ground channel Others Total
PONDICHERRY 3 6 266 53 0 328
State wise distribution of deep tubewells according to average length of water conveyance channel
State Total number of deep tubewells Average length of channel - Pucca Average length of channel - Kuccha Average length of channel - Underground Total - Average length of channels
PONDICHERRY 418 12 185 45 242
State wise distribution of deep tubewells according to average pumping hours
Name of State Avg pumping hours (0-4) Avg pumping hours (4 - 8) Avg pumping hours (8-12) Avg pumping hours (12 -16) Avg pumping hours (16 - 20) Avg pumping hours (20 - 24) Total
PONDICHERRY 8 103 152 16 21 28 328
State wise distribution of deep tubewells according to horse power of lifting device
State Horse Power (0 - 6) Horse Power (6 - 12) Horse Power (12 - 18) Horse Power ( > 18) Total
PONDICHERRY 1 46 212 69 328
State wise distribution of deep tubewells according to irrigation through supplementary source
State Supplementary irrigation (Ha) - Kharif Supplementary irrigation (Ha) - Rabi Supplementary irrigation (Ha) - Perennial Supplementary irrigation (Ha) - Others Total
PONDICHERRY 0 0 0 0 0
State wise distribution of deep tubewells according to ownership
State Government Cooperative Societies Panchayat Group of farmers Others Total
PONDICHERRY 24 0 1 16 287 328
State wise distribution of deep tubewells according to social status
STATE Scheduled caste Scheduled tribe Other social status of farmers Total Owned by other than individual farmers Total.1
PONDICHERRY 1 0 15 16 312 328
State wise distribution of deep tubewells according to source of finance
State Government Funds Farmers saving Loan and Saving Subsidy and Bank loan Others Total
PONDICHERRY 17 230 32 28 21 328
State wise distribution of deep tubewells according to the constraints
State Total No. of Tubewells in use No. of Tubewells with no constraints Constraints in utilisation of irrigation potential created - Inadequate power supply Constraints in utilisation of irrigation potential created - Mechanical break down Constraints in utilisation of irrigation potential created - Less water discharge Constraints in utilisation of irrigation potential created - Other reason Total - Constraints in utilisation Grand Total
PONDICHERRY 412 412 0 0 0 0 0 412
State wise distribution of deep tubewells according to the farmers holding size
State Marginal (0-1 ha) Small (1-2 ha) Medium (2-10 ha) Big ( > 10 ha) Total
PONDICHERRY 11 5 0 0 16
State wise distribution of deep tubewells according to water lifting device
State Submersible pumps Turbine pumps Others Total
PONDICHERRY 325 3 0 328
State wise distribution of deep tubewells by status
State In use Not in use - Temporarily Not in use - Salinity Not in use - Dried up Not in use - Destroyed Not in use - Others Total - Not in use Grand total ( Use + Not in use)
PONDICHERRY 321 7 0 0 0 0 7 328
State wise distribution of deep tubewells in use according to utilization of potential created
State No constraints in utilisation Constraints in utilisation - Inadequate power supply Constraints in utilisation - Mechanical break down Constraints in utilisation - Less water discharge Constraints in utilisation - Other reason Total - Constraints in utilisation Total in use
PONDICHERRY 320 0 1 0 0 1 321
State wise distribution of dugwells according to average pumping hours
State Avg pumping hours (0-4) Avg pumping hours (4 - 8) Avg pumping hours (8-12) Avg pumping hours (12 -16) Avg pumping hours (16 - 20) Avg pumping hours (20 - 24) Total
PONDICHERRY 12 28 28 10 0 0 78
State wise distribution of dugwells according to horse power of lifting device
State Horse Power (0-2) Horse Power (2 - 4) Horse Power (4 - 6) Horse Power (6 -8) Horse Power (8 - 10) Horse Power (Above 10) Unspecified Total
PONDICHERRY 0 0 32 31 12 3 0 78
State wise distribution of dugwells according to ownership
State Government Cooperative Societies Panchayat Group of farmers Individual farmers Others Total
PONDICHERRY 2 0 0 0 220 0 222
State wise distribution of dugwells according to social status
State Scheduled caste Scheduled tribe Other social status of farmers Total
PONDICHERRY 5 0 215 220
State wise distribution of dugwells according to source of finance
State Farmers saving Loan and Saving Subsidy and Bank loan Subsidy Only Others Total
PONDICHERRY 182 29 0 0 9 220
State wise distribution of dugwells according to the farmers holding size
State Marginal (0-1 ha) Small (1-2 ha) Medium (2-10 ha) Big ( > 10 ha) Total
PONDICHERRY 49 22 7 0 78
State wise distribution of dugwells according to water lifting device
State Electric pumps Diesel pumps Wind mills Solar pumps Man/Animal operated Others Total
PONDICHERRY 74 4 0 0 0 0 78
State wise distribution of dugwells by status
State Wells in use Not in use - Temporary Not in use - Abandoned (Salinity) Not in use - Dried up Not in use - Destroyed Not in use - Others Total - Not in use Grand total (Use + Not in use)
PONDICHERRY 191 12 0 4 15 0 31 222
State wise distribution of dugwells by type
State Pucca Kuchcha Dug-cum Borewell Others Total
PONDICHERRY 5 9 208 0 222
State wise distribution of dugwells in use according to utilization of potential created
State No constraints in utilisation Constraints in utilisation - Inadequate power supply Constraints in utilisation - Mechanical break down Constraints in utilisation - Less water discharge Constraints in utilisation - Other reason Total - Constraints in utilisation Total in use
PONDICHERRY 76 0 0 0 1 1 77
State wise distribution of shallow tubewells according to average length of water conveyance channel
State Total Number of Tubewells Avg length of Pucca Channel Avg length of Kuccha Channel Avg length of Under gr. Channel Avg length of Total
PONDICHERRY 3895 43 191 9 243
State wise distribution of shallow tubewells according to average pumping hours
State Avg pumping hours (0-4) Avg pumping hours (4 - 8) Avg pumping hours (8-12) Avg pumping hours (12 -16) Avg pumping hours (16 - 20) Avg pumping hours (20 - 24) Total
PONDICHERRY 321 2248 1337 259 187 18 4370
State wise distribution of shallow tubewells according to horse power of lifting device
State Horse Power (0-2) Horse Power (2 - 4) Horse Power (4 - 6) Horse Power (6 -8) Horse Power (8 - 10) Horse Power (Above 10) Unspecified Total
PONDICHERRY 9 2 863 1268 1030 1188 10 4370
State wise distribution of shallow tubewells according to irrigation through supplementary source
State Supplementary Irrigation-Kharif Supplementary Irrigation-Rabi Supplementary Irrigation-Perennial Supplementary Irrigation-Others Supplementary Irrigation-Total
PONDICHERRY 0 0 0 0 0
State wise distribution of shallow tubewells according to ownership
State Government Cooperative Societies Panchayat Group of farmers Individual farmers Others Total
PONDICHERRY 44 13 2 23 4259 29 4370
State wise distribution of shallow tubewells according to social status
State Scheduled caste Scheduled tribe Other social status of farmers Total Owned by other than individual farmers Total.1
PONDICHERRY 71 8 4203 4282 88 4370
State wise distribution of shallow tubewells according to source of finance
State Government fund Farmers saving Loan and Saving Subsidy and Bank loan Subsidy only Others Total
PONDICHERRY 275 3519 480 74 1 21 4370
State wise distribution of shallow tubewells according to the constraints
State No. of Tubewell in use No. of Tubewell with no constraints Constraints in utilisation - Inadequate power supply Constraints in utilisation - Mechanical break down Constraints in utilisation - Less water discharge Constraints in utilisation - Other reason Total - Constraints in utilisation Grand Total
PONDICHERRY 3643 3455 0 0 60 128 188 3643
State wise distribution of shallow tubewells according to the farmers holding size
State Marginal (0-1 ha) Small (1-2 ha) Medium (2-10 ha) Big ( > 10 ha) Total
PONDICHERRY 2185 1430 639 28 4282
State wise distribution of shallow tubewells according to water lifting device
State Electric pumps Diesel pumps Wind mills Solar pumps Man/Animal operated Others Total
PONDICHERRY 4314 50 1 0 0 5 4370
State wise distribution of shallow tubewells by status
State In use Not in use - Temporarily Not in use - Salinity Not in use - Dried up Not in use - Destroyed Not in use - Others Total - Not in use Grand total ( Use + Not in use)
PONDICHERRY 4332 16 12 1 8 1 38 4370
State wise distribution of shallow tubewells by type
State Shallow tubewell Filter Point Borewell Others Total
PONDICHERRY 2717 34 1603 16 4370
State wise distribution of shallow tubewells in use according to utilization of potential created
State No. in use - Public No. in use - Private No. in use - Total Potential created (Ha) - Public Potential created (Ha) - Private Potential created (Ha) - Total Potential utilised (Ha) - Public Potential utilised (Ha) - Private Potential utilised (Ha) - Total
PONDICHERRY 59 4273 4332 414 9539 9953 414 9484 9898
State wise distribution of surface flow schemes(other storage) in use and their potential created and utilized according to public and private
State No. in use - Public No. in use - Private No. in use - Total Potential created (Ha) - Public Potential created (Ha) - Private Potential created (Ha) - Total Potential utilised (Ha) - Public Potential utilised (Ha) - Private Potential utilised (Ha) - Total
PONDICHERRY 179 13562 13741 83 7224 7307 82 7213 7295
State wise distribution of surface flow schemes(permanent diversion) in use and their potential created and utilized according to public and private
State No. in use - Public No. in use - Private No. in use - Total Potential created (Ha) - Public Potential created (Ha) - Private Potential created (Ha) - Total Potential utilised (Ha) - Public Potential utilised (Ha) - Private Potential utilised (Ha) - Total
PONDICHERRY 9 5375 5384 7 4196 4203 7 4118 4125
State wise distribution of surface flow schemes(tanks) in use and their potential created and utilized according to public and private
State No. in use - Public No. in use - Private No. in use - Total Potential created (Ha) - Public Potential created (Ha) - Private Potential created (Ha) - Total Potential utilised (Ha) - Public Potential utilised (Ha) - Private Potential utilised (Ha) - Total
PONDICHERRY 19 993 1012 848 488 1336 485 487 972
State wise distribution of surface flow schemes(temporary diversion) in use and their potential created and utilized according to public and private
State No. in use - Public No. in use - Private No. in use - Total Potential created (Ha) - Public Potential created (Ha) - Private Potential created (Ha) - Total Potential utilised (Ha) - Public Potential utilised (Ha) - Private Potential utilised (Ha) - Total
PONDICHERRY 0 2 2 0 0 0 0 0 0
State wise distribution of surface flow schemes according to ownership
State Scheduled caste Scheduled tribe Other social status of farmers Total Owned by other than individual farmers
PONDICHERRY 243 46 18661 20142 1192
State wise distribution of surface flow schemes according to social status
State Scheduled caste Scheduled tribe Other social status of farmers Total Owned by other than individual farmers Total.1
PONDICHERRY 243 46 18661 18950 1192 20142
State wise distribution of surface flow schemes according to source of finance
State Government funds Farmers saving Loan & Saving Subsidy & Bank loan Subsidy only Others Total
PONDICHERRY 13926 3411 240 0 0 0 17577
State wise distribution of surface flow schemes according to the farmers holding size
State Marginal (0-1 ha) Small (1-2 ha) Medium (2-10 ha) Big ( > 10 ha) Total
PONDICHERRY 16420 1697 799 34 18950
State wise distribution of surface flow schemes by status
State Schemes in use Schemes not in use - Temporary Schemes not in use - Abandoned (Salinity) Schemes not in use - Dried up Schemes not in use - Destroyed Schemess not in use - Others Total - Schemes not in use Grand Total (Not in Use + In Use)
PONDICHERRY 17641 4 0 0 0 0 4 17645
State wise distribution of surface flow schemes by type
State Flow schemes - Storage Flow schemes - Permanent Diversion Flow schemes - Temporary Diversion Flow schemes - Water Circulation Total
PONDICHERRY 1191 14342 2111 1 17645
State wise distribution of surface flow schemes in use according to utilization of potential created
State No. of constraints in utilisation Constraints in utilisation - Non-filling up of storage Constraints in utilisation - Siltation of storage Constraints in utilisation - Breakdown of channel Constraints in utilisation - Other reason Total - Constraints in utilisation Total in use
PONDICHERRY 20118 0 2 3 16 21 20139
State wise distribution of surface lift schemes according to average pumping hours
State Avg pumping hours (0-4) Avg pumping hours (4 - 8) Avg pumping hours (8-12) Avg pumping hours (12 -16) Avg pumping hours (16 - 20) Avg pumping hours (20 - 24) Total
PONDICHERRY 0 7 0 0 0 0 7
State wise distribution of surface lift schemes according to horsepower
State Horse Power (0-2) Horse Power (2 - 4) Horse Power (4 - 6) Horse Power (6 -8) Horse Power (8 - 10) Horse Power (Above 10) Unspecified Total
PONDICHERRY 0 0 1 0 0 6 0 7
State wise distribution of surface lift schemes according to ownership
State Government Cooperative Societies Panchayat Group of farmers Individual farmers Others Total
PONDICHERRY 0 0 0 0 7 0 7
State wise distribution of surface lift schemes according to social status
State Scheduled caste Scheduled tribe Other social status of farmers Total Owned by other than individual farmers
PONDICHERRY 0 0 7 7 0
State wise distribution of surface lift schemes according to the farmers holding size
State Marginal (0-1 ha) Small (1-2 ha) Medium (2-10 ha) Big ( > 10 ha) Total
PONDICHERRY 4 3 0 0 7
State wise distribution of surface lift schemes according to water lifting device
State Electric pumps Diesel pumps Wind mills Solar pumps Others Total
PONDICHERRY 6 399 0 0 1 406
State wise distribution of surface lift schemes by status
State Schemes in use Schemes not in use - Temporary Schemes not in use - Abandoned (Salinity) Schemes not in use - Dried up Schemes not in use - Sinking Schemes not in use - Others Schemes not in use - Total Grand total
PONDICHERRY 405 0 1 0 0 0 1 406
State wise distribution of surface lift schemes by type
State Lift Scheme - On River Lift Scheme - On Stream Lift Scheme - On Drain Lift Scheme - On Tank/Pond Total
PONDICHERRY 7 0 399 0 406
State wise dugwells according to the constraints
State No. of dugwells in use No constraints in utilisation Constraints in utilisation - Inadequate power supply Constraints in utilisation - Mechanical break down Constraints in utilisation - Less water discharge Constraints in utilisation - Other reason Total constraints in utilisation of irrigation potential created Grand Total
PONDICHERRY 191 191 0 0 0 0 0 191
State wise dugwells according to water distribution system
State Sprinkler Drip Irrigation Open channel Under ground channel Others Total
PONDICHERRY 7 9 196 10 0 222
State wise dugwells average length of water conveyance channel
State Total Number of Dugwells Average length of channel - Pucca Average length of channel - Kuccha Average length of channel - Underground Total
PONDICHERRY 222 1 94 2 97
State wise irrigation through supplementary sources
State Supplementary irrigation - Kharif Supplementary irrigation - Rabi Supplementary irrigation - Perennial Supplementary irrigation - Others Total
PONDICHERRY 0 0 0 0 0
State wise irrigation through supplementary sources under surface flow schemes
State Supplementary irrigation (Ha) - Kharif Supplementary irrigation (Ha) - Rabi Supplementary irrigation (Ha) - Perennial Supplementary irrigation (Ha) - Others Total
PONDICHERRY 0 0 0 0 0
State wise irrigation through supplementary sources with dugwells
State Supplementary irrigation (Ha) - Kharif Supplementary irrigation (Ha) - Rabi Supplementary irrigation (Ha) - Perennial Supplementary irrigation (Ha) - Others Total
PONDICHERRY 0 0 0 0 0
State wise potential utilized through deep tubewells
State Actual area irrigated (Ha) - Kharif Actual area irrigated (Ha) - Rabi Actual area irrigated (Ha) - Perennial Actual area irrigated (Ha) - Others Total
PONDICHERRY 436 471 461 45 1413
State wise potential utilized through dugwells
State Actual area irrigated (Ha) - Kharif Actual area irrigated (Ha) - Rabi Actual area irrigated (Ha) - Perennial Actual area irrigated (Ha) - Others Total
PONDICHERRY 136 174 66 17 393
State wise potential utilized through shallow tubewells
State Kharif Rabi Perennial Others Total
PONDICHERRY 3501 2538 1415 468 7922
State wise potential utilized through surface lift schemes
State Actual area irrigated - Kharif Actual area irrigated - Rabi Actual area irrigated - Perennial Actual area irrigated - Others Total
PONDICHERRY 0 6 0 324 330
State wise potential utilized under surface flow schemes
State Actual area irrigated (Ha) - Kharif Actual area irrigated (Ha) - Rabi Actual area irrigated (Ha) - Perennial Actual area irrigated (Ha) - Others Total
PONDICHERRY 2735 8378 48 0 11161
State wise shallow tubewells according to water distribution system
State Sprinkler Drip Irrigation Open channel Under ground channel Others Total
PONDICHERRY 6 554 3620 173 17 4370
State wise surface flow schemes- potential created and utilized through tanks
State No of tanks Irrigation potential created - Kharif Irrigation potential created - Rabi Irrigation potential created - Perennial Irrigation potential created - Others Total Irrigation potential utilised - Kharif Irrigation potential utilised - Rabi Irrigation potential utilised - Perennial Irrigation potential utilised - Others
PONDICHERRY 1013 1200 82 54 1 972 836 82 53 1
State wise surface flow schemes according to the constraints
State Total No. of Schemes in use No. of Schemes with no constraints Constraints in utilisation of irrigation potential created - Non-filling of storage Constraints in utilisation of irrigation potential created - Siltation of storage Constraints in utilisation of irrigation potential created - Break down of channel Constraints in utilisation of irrigation potential created - Other reason Total - Constraints in utilisation Grand Total
PONDICHERRY 17641 14189 5 2 14 3431 3452 17641
State wise surface flow schemes according to water distribution system
State Sprinkler Drip Irrigation Open channel Under ground channel Others Total
PONDICHERRY 30 17 20085 4 6 20142
State wise surface flow schemes average length of water conveyance channel
State Total number of schemes Pucca Kutcha Under Total
PONDICHERRY 17645 18 432 0 450
State wise surface lift schemes according to the constraints
State Total No. of Schemes in Use No. of schemes with no constraints Constraints in utilisation of irrigation potential - Power inadequate Constraints in utilisation of irrigation potential - Mechanical break down Constraints in utilisation of irrigation potential - Less water discharge Constraints in utilisation of irrigation potential - Storage siltation Constraints in utilisation of irrigation potential - Channel break down Constraints in utilisation of irrigation potential - Other reason Total - Constraints in utilisation Grand Total
PONDICHERRY 405 405 0 0 0 0 0 0 0 405
State wise surface lift schemes according to water distribution system
State Sprinkler Drip Irrigation Open channel Under ground channel Others Total
PONDICHERRY 0 0 7 0 0 7
Year-wise capacity addition in 11th plan
Category States/UTs Total/Sector 2007-08 - Hydel 2007-08 - Thermal 2007-08 - Total 2008-09 - Hydel 2008-09 - Thermal 2008-09 - Total 2009-10 - Hydel 2009-10 - Thermal 2009-10 - Total 2010-11 - Hydel 2010-11 - Thermal 2010-11 - Total 2011-12 - Hydel 2011-12 - Thermal 2011-12 - Total Total (2007-12) - Hydel Total (2007-12) - Thermal Total (2007-12) - Total
II.EDs Pondicherry Total 0.00 0.00 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00
supplementary sources
State District Supplementary irrigation (Ha) - Kharif Supplementary irrigation (Ha) - Rabi Supplementary irrigation (Ha) - Perennial Supplementary irrigation (Ha) - Others Total
PONDICHERRY KARAIKAL 0 0 0 0 0

Write your suggestion for Illusions